Energy requalification and housing redevelopment at Gorizia Hospital.
While carrying out energy requalification at the San Giovanni di Dio hospital in Gorizia, DQG replaced all the doors and windows in the public building.
As a replacement for the old casings, which at that point were obsolete, 510 uPVC triple-glazed doors and windows were installed; this notably improved the building performances in terms of both living comfort and energy savings.
Our doors and windows, entirely made in Italy, were all installed in the record time of 30 days, without disturbing the normal hospital routine.
Afterwards, an instrumental analysis was done to verify that the installation, that was “CasaClima” certified, was effective and correct: final testing gave truly positive results, confirming the quality of our products and the professionalism of our assembly team.
Building: Company
Intervention: Renovation
Number of windows/doors: 510
Country: Italy
Area: Gorizia
Other pubblic construction projects
Let’s get your
project started!



