Installation of 370 doors and windows in two weeks.
Having a healthy climate inside buildings is very important, above all in classrooms. The quality of the air and the thermal and acoustic insulation determine the wellbeing and performance of those who use the various rooms.
For this reason it is important to use advanced door and window casings, as was done at the Ponte di Legno Elementary School (Brescia): a new construction project for which DQG produced and installed over 370 high-performance fixtures.
Specifically, a vast series of windows, transom windows, fixed glazings, entrance doors, emergency exits with panic bars and out-of-square windows for the top floor of the building were created.
All the doors and windows provided were installed in just two weeks, proving DQG’s efficiency in meeting delivery times without compromising the quality of the work.
Building: School
Intervention: New building
Number of windows/doors: 370
Country: Italy
Area: Ponte di Legno, Brescia